Evaluation and Review Technique (PERT) method. PERT is a method that has three-time durations, namely optimistic, most likely, and pessimistic time. PERT can also provide information about the project completion
Featured Image
Why is it important?
The purpose of this study is to assist the project manager in making a project schedule, when the project starts and when the project is finished and how long it takes to complete the project.
Perspectives
The result of this research is to assist the project manager in determining how long it will take to implement the project and to know which work is considered critical (work that cannot be postponed) so that any obstacles can be overcome so that the project can be completed on time.
Sufa Atin
Universitas Komputer Indonesia
Read the Original
This page is a summary of: Implementation of the program evaluation and review technique (PERT) method to determine estimated time of project completion, January 2023, American Institute of Physics,
DOI: 10.1063/5.0130296.
You can read the full text:
Contributors
The following have contributed to this page