All Stories

  1. Extended Quality Control: Suppliers’ Tooling Lifecycle Management
  2. Automated System for Transportation and Separation of Textile-Cutting Surpluses: A Case Study in a Portuguese Clothing Company
  3. Automated System for Transportation and Separation of Textile Cutting Surpluses: a Case Study
  4. Water Infrastructure Asset Management
  5. Quality Management Systems in Medical Devices: Barriers and Solutions in ISO 13485 Implementation
  6. A scenario-based framework for strategic inspection decision-making in high-volume production environments
  7. Improving a Logistic Complaints Process Through a Six Sigma Project
  8. Quality costs and Industry 4.0: inspection strategy modelling and reviewing
  9. Dashboard Development for the Quality Department of a Company from the Automotive Industry
  10. Inspection Planning Improvement Framework Based on the PDCA Cycle
  11. Assessment of Alternative Quality Control Plans in Dynamic Contexts: A Simulation Approach
  12. Quality Control in Remanufacturing: Distinguishing Features and Techniques
  13. Wastes Identification Through Kaizen Events: A Case Study in the Automotive Sector
  14. Implementation of a Quality Cost Management Model: Case Study from the Textile Industry Sector
  15. Quality Cost of 100% Inspection on Manufacturing Processes: Advantages of using a Simulation Approach
  16. Inspection and Repair Cost Modeling Granularity: A Pragmatic Approach
  17. Adaptation Mechanisms and Service Quality Dimensions in Dynamic and Turbulent Environments: Empirical Results
  18. Application of Taguchi Method for the Analysis of a Multiple Air Jet Impingement System with and without Target Plate Motion
  19. Assessing the COVID-19 Performance Indicators Used in the Portuguese Daily Situation Report
  20. Industry practices on the rework of defective products: survey results
  21. A decision-making model for the rework of defective products
  22. Service quality factors in the construction sector: A literature review
  23. Performance indicators in the construction industry: a study with Portuguese companies
  24. Worker Location-Based Safety Performance Indicator
  25. Supplier pre-qualification method for the Portuguese construction industry
  26. Productivity Improvement of Transmission Electron Microscopes - A Case Study
  27. A framework to improve training and development of workers’ technical skills: effects on operational performance during company relocation
  28. A Proposed Representative Sampling Methodology
  29. Designing an experiment to study a multiple jet impingement system
  30. Global Process Effectiveness (GPE) is proposed as a better performance indicator than OEE
  31. A dynamic programming model for designing a quality control plan in a manufacturing process
  32. Quality control planning should use the expected value of total quality costs of alternative plans.
  33. Developing organisational learning through QC story
  34. Evolution of process capability in a manufacturing process
  35. Developing dashboards for SMEs to improve performance of productive equipment and processes
  36. Use of Analytic Hierarchy Process (AHP) to Support the Decision-Making About Destination of a Batch of Defective Products with Alternatives of Rework and Discard
  37. Multivariate Statistical Process Control Based on Principal Component Analysis: Implementation of Framework in R
  38. Key Inefficiencies and Improvement Opportunities in the Textile Sector: A Case Study
  39. Knowledge Management in a Dynamic Manufacturing Context: A Case Study
  40. Performance assessment system development based on performance prism in social services
  41. Implementing the balanced scorecard in excel for small and medium enterprises
  42. Application of Lean Production Principles and Tools for Quality Improvement of Production Processes in a Carton Company
  43. Design Procedure to Develop Dashboards Aimed at Improving the Performance of Productive Equipment and Processes
  44. Application of SPC and Quality Tools for Process Improvement
  45. On the estimation of hospital beds occupancy after hip surgery
  46. Statistical process control automation in the final inspection process: An industrial case study
  47. Methodology for uncertainty characterization of performance measures
  48. A Fuzzy Logic Approach in the Definition of Risk Acceptance Boundaries in Occupational Safety and Health
  49. Lean Six Sigma Project for Productivity Enhancement
  50. improving the organisation - where to start?
  51. Uncertainty Characterization of Performance Measure: A Fuzzy Logic Approach
  52. Measuring and managing operational risk in industrial processes
  53. The Application of a Fuzzy Approach to the Analysis of OSH Practitioners Level of Risk Acceptance
  54. Uncertainty Components in Performance Measures
  55. Resource Constrained Project Scheduling with General Precedence Relations Optimized with SAT
  56. Development of a performance measurement framework for SMEs
  57. Performance measurement in English SMEs: survey results
  58. Performance measures and Quality Tools in Portuguese SMEs: survey results