All Stories

  1. Classification of Brazilian airports using multiple operational criteria: A data mining approach
  2. A Q-learning-based variable greedy algorithm to minimize the sum of total earliness and tardiness in a no-wait flowshop scheduling problem
  3. Greedy Randomized Adaptive Search Procedure for the Student Clustering Problem in schools
  4. A hybrid neighborhood search meta-heuristic for the School Bus Routing Problem with homogeneous fleet
  5. A comparative computational study for single-machine problems with controllable processing times and limited resource consumption
  6. Hub-and-spoke network design problem with multiple modes of transport
  7. A comparative computational study for parallel-machine problems with sustainable manufacturing constraints
  8. A Hybrid Genetic Algorithm for Minimizing Weighted Tardiness in a Hybrid Flow Shop: A Case Study in the Electronics Industry
  9. Selection of the transportation mode of green hydrogen in Brazil: An application of the spherical fuzzy PROMETHEE II
  10. A speed-up procedure and new heuristics for the classical job shop scheduling problem: A computational evaluation
  11. A systematic review of permutation flow shop scheduling with due-date-related objectives
  12. A mixed-integer linear programming model for optimizing green hydrogen supply chain networks
  13. An overview of industrial engineering and operations management over the first fifty years of Engineering Optimization
  14. ANALYZING PRODUCTION SCHEDULING RESEARCH: INSIGHTS FROM THE SCOPUS DATABASE ON BRAZILIAN ACADEMIA
  15. Development of a spatial multicriteria approach to determine the location of loading/unloading spaces in urban centers
  16. A Scheduler for Smart Home Appliances Based on a Novel Concept of Tariff Space
  17. Applications of constraint programming in production scheduling problems: A descriptive bibliometric analysis
  18. Green Hydrogen Supply Chain: Difficulties And Opportunities In The Brazilian Reality
  19. Configurations and features of demand responsive transports
  20. A constraint programming-based iterated greedy algorithm for the open shop with sequence-dependent processing times and makespan minimization
  21. Coronavirus Optimization Algorithms for Minimizing Earliness, Tardiness, and Anticipation of Due Dates in Permutation Flow Shop Scheduling
  22. A genetic iterated greedy algorithm for the blocking flowshop to minimize total earliness and tardiness
  23. Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window
  24. Demand response application in industrial scenarios
  25. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking
  26. A novel BRKGA for the customer order scheduling with missing operations to minimize total tardiness
  27. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
  28. Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness
  29. A critical-path based iterated local search for the green permutation flowshop problem
  30. New efficient heuristics for scheduling open shops with makespan minimization
  31. Hybrid matheuristics for the multi-capacitated clustering problem
  32. A differential evolution algorithm for the customer order scheduling problem with sequence-dependent setup times
  33. A hybrid genetic algorithm for the hybrid flow shop scheduling problem with machine blocking and sequence-dependent setup times
  34. A size-reduction algorithm for the order scheduling problem with total tardiness minimization
  35. Minimizing total tardiness for the order scheduling problem with sequence-dependent setup times using hybrid matheuristics
  36. Effective Heuristics and an Iterated Greedy Algorithm to Schedule Identical Parallel Machines Subject to Common Restrictive Due Windows
  37. Discussion of “Boosting Genetic Algorithm Performance in Pump Scheduling Problems with a Novel Decision-Variable Representation” by Luigi Cimorelli, Andrea D’Aniello, and Luca Cozzolino
  38. A new flexible benchmarking monitoring system: a case study for the civil construction sector in Brazil
  39. Modeling and scheduling hybrid open shops for makespan minimization
  40. A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions
  41. The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem
  42. Um algoritmo híbrido busca tabu/ILS para o problema de sequenciamento da produção em ambiente open shop
  43. An integer linear programming approach for pavement maintenance and rehabilitation optimization
  44. Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods
  45. Customer order scheduling problem to minimize makespan with sequence-dependent setup times
  46. Truck routing cut and fill problem in roadworks using integer programming
  47. Variable fixing heuristics for the capacitated multicommodity network flow problem with multiple transport lines, a heterogeneous fleet and time windows
  48. Heuristic methods for the single-machine scheduling problem with periodical resource constraints
  49. Variable fixing heuristics for solving multiple depot vehicle scheduling problem with heterogeneous fleet and time windows
  50. A genetic algorithm with neighborhood search procedures for unrelated parallel machine scheduling problem with sequence-dependent setup times
  51. A genetic algorithm for scheduling open shops with sequence-dependent setup times
  52. Models and algorithms for network design in urban freight distribution systems
  53. A matheuristic algorithm for the one-dimensional cutting stock and scheduling problem with heterogeneous orders
  54. Colored Petri Net Simulation Model to Allocate Motor Graders for Earthmoving Operations
  55. Proposed Architecture for Energy Efficiency and Comfort Optimization in Smart Homes
  56. Memetic Algorithm for the Heterogeneous Fleet School Bus Routing Problem
  57. A Hybrid Genetic Algorithm for Solving the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times
  58. Locating on-street loading and unloading spaces by means of mixed integer programming
  59. Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times
  60. A Genetic Algorithm Integrated with Monte Carlo Simulation for the Field Layout Design Problem
  61. An integrated optimization and simulation model for refinery planning including external loads and product evaluation
  62. Optimization Techniques Applied to Earthmoving and Highway Construction: a Survey
  63. Integrated optimization model for location and sizing of offshore platforms and location of oil wells
  64. Um algoritmo genético multiobjetivo para a programação integrada de veículos e tripulações
  65. A Branch-and-Bound Algorithm for Optimal Pump Scheduling in Water Distribution Networks
  66. An Integer Linear Programming Model for the Multiperiod Production Planning of Precast Concrete Beams
  67. A hybrid Genetic Algorithm for the vehicle and crew scheduling in mass transit systems
  68. Rolling Surface Evaluation Model considering Topographic, Geotechnical, and Climatic Aspects in Low-Volume Roads
  69. Distribution of Materials in Road Earthmoving and Paving: Mathematical Programming Approach
  70. Restrições de controle sobre cores decompostas: uma proposta no controle supervisório de sistemas a eventos discretos utilizando redes de Petri coloridas