All Stories

  1. Reverse Engineering in Electroless Coatings: An Application on Bath Parameter Optimization for User-Defined Ni-B-P Coating Properties
  2. Sentiment Analysis of Twitter Data of Hepsiburada E-commerce Site Customers with Natural Language Processing
  3. Short-Term Wind Speed Forecasting Using Nonlinear Autoregressive Neural Network: A Case Study in Kocaeli-Türkiye
  4. Due-Date Assignment
  5. Dynamic Integrated Process Planning and Scheduling
  6. Dynamic Integrated Process Planning, Scheduling, and Due-Date Assignment
  7. Integrated Process Planning and Scheduling
  8. Integrated Process Planning, Scheduling, Due-Date Assignment, and Delivery
  9. Integrated Process Planning, Scheduling, and Due-Date Assignment
  10. Integrated Process Planning, Scheduling, and Due-Date Assignment
  11. Introduction to Integrated Process Planning, Scheduling, and Due-Date Assignment
  12. Process Planning
  13. Scheduling in Manufacturing
  14. Scheduling with Due-Date Assignment
  15. Scheduling with Due-Window Assignment
  16. Solution Techniques in Integrated Manufacturing Functions
  17. Stock Closing Price Prediction with Machine Learning Algorithms: PETKM Stock Example In BIST
  18. A new approach to design S-box generation algorithm based on genetic algorithm
  19. A Novel Hypogenetic Chaotic Jerk System: Modeling, Circuit Implementation, and Its Application
  20. Dynamic integrated process planning, scheduling and due date assignment (DIPPSDDA)
  21. Concurrent solution of WATC scheduling with WPPW due date assignment for environmentally weighted customers, jobs and services using SA and its hybrid
  22. Modelling Porosity Permeability of Ceramic Tiles using Fuzzy Taguchi Method
  23. SOLVING PROCESS PLANNING, WEIGHTED APPARENT TARDINESS COST DISPATCHING, AND WEIGHTED PROCESSING PLUS WEIGHT DUE-DATE ASSIGNMENT SIMULTANEOUSLY USING A HYBRID SEARCH
  24. Optimum Tire Selection with Grey Relational Analysis
  25. İmalat Firmalarında İş Sağlığı ve Güvenliği Yatırım Harcamaları İle Kaza Oranları ve İş Kazası Maliyetleri İlişkisi: İşletme Bütçesine İSG Harcamaları İçin Kaynak Tahsis Edilmesinin Önemi
  26. FİRMA BÜYÜKLÜĞÜNÜN 6331 SAYILI İŞ SAĞLIĞI VE GÜVENLİĞİ KANUNU KAPSAMINDA BİREYSEL VE ÖRGÜTSEL SONUÇLAR ÜZERİNDEKİ ETKİSİ: İMALAT FİRMALARI ÜZERİNDE BİR ARAŞTIRMA
  27. PROCESS PLANNING AND WEIGHTED SCHEDULING WITH WNOPPT WEIGHTED DUE-DATE ASSIGNMENT USING HYBRID SEARCH FOR WEIGHTED CUSTOMERS
  28. Dynamic bottleneck elimination in mattress manufacturing line using theory of constraints
  29. An investigation on competitiveness in services: Turkey versus European Union
  30. Competitiveness in Services: Turkey Versus European Union