What is it about?

This paper is giving a method to allocate the correct number of buffers between stations in a production line to get the maximum efficiency for the line, even though the line is unbalanced. The method invented is called 6 Steps OBA (Optimal Buffer Allocation) method. The production engineer need to follow the six steps in the method and finally the correct number of buffers between stations could be identified.

Featured Image

Why is it important?

Six Steps OBA method is user friendly method so that non technical personnel also could use it. The management only need to decide the total number of buffers allowed in the whole production line, then the method will solve for the number of buffers to be allocated at each buffer station.

Perspectives

I hope this Six Steps OBA method will benefit management of a manufacturing companies in order to achieve the maximum throughput rate from their production line hence giving a maximum profit. This user friendly method is easy to be understood and applied at any unpaced production line even though by non technical personnel.

Mr Mohd Shihabudin Ismail
University Malaysia Perlis

Read the Original

This page is a summary of: A Management Guide for Determination of Optimal Buffer Allocation in Unpaced Production Line Using 6 Steps OBA, Applied Mechanics and Materials, September 2015, Trans Tech Publications,