What is it about?
This paper explains bored pile construction works in bridge foundation. Three types of boring methods manual hole excavation, rotury drilling and percussion methods are described with the experience of Kathmandu-Terai Fast track Project.
Featured Image
Read the Original
This page is a summary of: Bored Piling in Bridge Construction: An experience of Kathmandu-Terai Fast Track (Expressway) Road Project, KTFT Journal, October 2024, Nepal Journals Online (NepJOL),
DOI: 10.3126/ktftj.v4i1.70169.
You can read the full text:
Contributors
The following have contributed to this page







