What is it about?

Structural failure is observed on cobblestone roads, and it would be constructed with good quality or low quality of materials. Nekemte Cobblestones Projects have been started in 2014 widely which were failed in most areas today as we observed that needs to be addressed and a corresponding remedial measures must be drawn. A probable remedial actions have been organized for all experiential failure or demolished to gain regular road protest of the study area. An assessment was made by using statement, meetings, laboratory test and field test to control the appropriateness of the cobblestones, motivated material to assist as a subgrade for road building based on project specifications and Ethiopian Road Authority (ERA) low volume road Specification. From the field tests and laboratory tests carried out, it was observed that the causes of cobblestone road failures of this road section are mainly due to the construction steps/sequence, quality of materials, road construction time, lack of proper design and quality control, absences of drainage structures, lack of highly compaction, lack of accurately fill fine aggregate and suddenly high loads vehicle applied on cobblestone road.

Featured Image

Why is it important?

Traffic, and shoulder material have been worn away by Eroded by water. Settlement and Carriageway have been repaved leaving the shoulder surface at lower level Cause by Grass, weeds and bushes have been allowed to grow. This Result Surface water cannot flow directly from the carriageway to the roadside ditch. Silts accumulate at the edge of the carriageway. Deflection of the road centerline and shoulder. Deterioration of the road surface and destroyed without service. Distress on the road throughout cross section and road component. Sight distance from road users impaired, reducing road safety and increasing risk of accidents to person and animals.

Perspectives

Writing this article was a great pleasure as it has co-authors with whom I have had long standing collaborations. This article also lead to rare Early Damage of Cobble Stone Road Construction and Its Remedial Measurements me and ultimately to a greater involvement in cobblestone research.

Mr. Shiferaw Garoma Wayessa
Wollega University

Read the Original

This page is a summary of: Assessment of the Cause and Effect of Early Damage of Cobble Stone Road Construction and Its Remedial Measurements: A Case of Nekemte Town Cheleleki Sub City, Journal of Building Material Science, May 2021, Bilingual Publishing Co.,
DOI: 10.30564/jbms.v3i1.3149.