What is it about?

We propose an approximate modeling approach tailored for estimating the cost of a multi-asteroid, single-spacecraft rendezvous mission without a predetermined order. The method requires much less calculation compared to previous cost evaluation methods and therefore is highly suitable for global optimization of multiple spacecraft missions with large-scale targets.

Featured Image

Read the Original

This page is a summary of: Rapid Cost Evaluation Model for Order-Undetermined Multi-Asteroid Rendezvous Missions, Journal of Guidance Control and Dynamics, July 2025, American Institute of Aeronautics and Astronautics (AIAA),
DOI: 10.2514/1.g008961.
You can read the full text:

Read

Contributors

Be the first to contribute to this page