What is it about?
The article addresses the problem of determining the sequence of entering orders for production in a flexible manufacturing system implementing technological operations of cutting sheet metal. Adopting a specific ranking of production orders gives rise to the vector of delays and waste in the form of incompletely used sheets. A new method was postulated for determining the optimal sequence of orders in terms of two criteria: the total cost of delays and the amount of production waste. The examples illustrate the advantages of the proposed method compared with the popular heuristic principles.
Featured Image
Why is it important?
A new method was postulated for determining the optimal sequence of orders in terms of two criteria: the total cost of delays and the amount of production waste. The examples illustrate the advantages of the proposed method compared with the popular heuristic principles.
Read the Original
This page is a summary of: Scheduling Production Orders, Taking into Account Delays and Waste, Management and Production Engineering Review, January 2014, De Gruyter,
DOI: 10.2478/mper-2014-0021.
You can read the full text:
Contributors
The following have contributed to this page