What is it about?

A weekly operational planning model for a run-off river system in Tamil Nadu India namely Tambiraparani has been developed using a simulation model. The river acts as a main canal and there is huge loss.gain during the operational period. This is taken into consideration for planning and this has improved the water availability in the tail end. The result shows that much more area could be brought to irrigation.

Featured Image

Read the Original

This page is a summary of: A weekly operational planning model for a run-off-the-river system: some simulation results from the Tambiraparani river, Tamil Nadu, India, Water Policy, November 2009, IWA Publishing,
DOI: 10.2166/wp.2009.094.
You can read the full text:

Read

Contributors

The following have contributed to this page