What is it about?
The 2nd Radin Inten Airport authorities renovate its airport starting from extending the runway as well as expanding the apron and its terminal building. The runway was extended from previously 2,500 m to 3,000 m. The development was due to the 2nd Radin Inten Airport was chosen to become a full hajj embarkation and also due to a potential increase in airport activity every year. The airport also must be able to accommodate the Airbus A330-200 and A330-300 aircraft to increase passenger capacity. The study was conducted by evaluate the existing conditions of the 2nd Radin Inten Airport and analyse whether the runway at the 2nd Radin Inten Airport can accomodate the Airbus A330-200 and A330-300.
Featured Image
Why is it important?
The results of the analysis showed that there were significant increases in the passenger and cargo activities. Furthermore, 2nd Radin Inten Airport can serve Airbus A330-200 aircraft types with the required runway length of 2,753 m for such aircraft, while the A330-300 unable to be served because this aircraft requires 3,100 m runway length in order to take-off and landing safely.
Read the Original
This page is a summary of: Analisis Panjang Runway untuk Pendaratan dan Take-off Pesawat Airbus A330-200 dan A330-300, Semesta Teknika, January 2019, JK School of Gov, Universitas Muhammadiyah Yogyakarta,
DOI: 10.18196/st.221233.
You can read the full text:
Contributors
The following have contributed to this page