Unpredictable electrical demand causes strain on the electrical grid that can lead to power outages and decreased efficiency. Industrial consumers can have a large electrical demand caused by running multiple pieces of equipment at the same time. We use the genetic algorithm with logged, real-time energy use data from a batch manufacturer to schedule process operations in a manner that saves the consumer money and reduces their electrical demand.