What is it about?
The implementation of customization can be through the development of a Work Breakdown Structure (WBS) at the green retrofitting office building, to detail the resources needed in project planning, monitoring, and control.
Featured Image
Photo by Lily Banse on Unsplash
Why is it important?
The implementation of customization can be through the development of a Work Breakdown Structure (WBS) of green retrofitting work that can improve the quality of resource planning through detailed work in project planning, monitoring, and control. The preparation of the WBS structure from these results of the study is proof that the WBS structure improves the quality of resource planning.
Perspectives
I hope that this research will make it easier for building owners to carry out green retrofitting activities through the activity of the WBS structure of green retrofitting work which is divided into 3 (three) stages of work: Planning, construction and post-construction.
Dr., S.T., M.T. Bernadette Detty Kussumardianadewi
Universitas Indonesia
Read the Original
This page is a summary of: Development of Work Breakdown Structure (WBS) in High-Rise Office Buildings using Green Retrofitting based on GBCI and Minister of PUPR Regulation No. 21 of 2021 to Improve the Quality of Resource Planning, Civil Engineering and Architecture, March 2024, Horizon Research Publishing Co., Ltd.,
DOI: 10.13189/cea.2024.120207.