Two real situations found in factories are addressed, which differ by considering (or not) the setup operations in tanks that provide liquid for bottling lines. Depending on the technology involved in the production process, the number of tank swaps is relevant (Case A) or it can be neglected (Case B)
Featured Image
Why is it important?
Approaches can be applied in real scenarios.
Perspectives
Read the Original
This page is a summary of: Alternative Mathematical Models and Solution Approaches for Lot-Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations, Mathematical Problems in Engineering, January 2017, Hindawi Publishing Corporation,
DOI: 10.1155/2017/6754970.