What is it about?
it is about human work posture when preparing Ground contorl station of Medium Altitude Long Endurance operation.
Featured Image
Why is it important?
The operation takes 24 hours. The findings show the operator need helping tools to reduce the REBA score, and the body getures found weird (i.e., near to body limitiation) due to range of percentile and GCS dimension.
Perspectives
This research highlight thas the success of an unmanned aerial vehicle mission MALE is not only measured by the its results, but we shall appreciate the whole system and the operator working behind it. For 24 hours the operator works for monitoring, maintaining and making decisions is one of the most important processes. Therefore, the GCS must be designed human centered to avoid detrimental effects of physical and mental. it is lined with STANAG 4671 USAR 1703-1704
Apid Rustandi
Read the Original
This page is a summary of: Ground Control Station Design Optimization for Indonesian Operator Work Postures and Muscle Stimulation in Preparing the MALE Class UAV, September 2022, ACM (Association for Computing Machinery),
DOI: 10.1145/3557738.3557824.
You can read the full text:
Contributors
The following have contributed to this page







