What is it about?
In high-rise construction, optimizing tower crane placement can reduce costs, time, and safety risks. This paper introduces a new mathematical model to determine the best number, location, and type of cranes and supply points. Testing showed a 53% cost reduction and 54% time savings, improving crane collision management.
Featured Image
Read the Original
This page is a summary of: Optimized multi-tower crane layout planning: determine height, location and type to improve operational safety, Engineering Construction & Architectural Management, March 2025, Emerald,
DOI: 10.1108/ecam-10-2024-1401.