The present study develops four valuable adjustment approaches, designed to achieve a compromise between the views of the client and contractor. These can be used to control projects after a force majeure event like COVID-19.
Featured Image
Read the Original
This page is a summary of: S-curve adjustment approaches for a force majeure event: COVID-19 as an example, Engineering Construction & Architectural Management, October 2023, Emerald,