What is it about?

The present study develops four valuable adjustment approaches, designed to achieve a compromise between the views of the client and contractor. These can be used to control projects after a force majeure event like COVID-19.

Featured Image

Read the Original

This page is a summary of: S-curve adjustment approaches for a force majeure event: COVID-19 as an example, Engineering Construction & Architectural Management, October 2023, Emerald,
DOI: 10.1108/ecam-03-2023-0303.
You can read the full text:

Read

Contributors

The following have contributed to this page