What is it about?
To understand the transformer behavior under non-standard operation conditions, the hysteresis modeling of the transformer is required. To parametrize the hysteresis model, a special purpose saturation test data is combined with typical saturation curves. The modeling results are validated by laboratory tests.
Featured Image
Read the Original
This page is a summary of: Toward a simple topological model of a three-phase transformer including deep saturation conditions, COMPEL The International Journal for Computation and Mathematics in Electrical and Electronic Engineering, September 2023, Emerald,
DOI: 10.1108/compel-12-2022-0427.
You can read the full text:
Contributors
The following have contributed to this page







