What is it about?

This paper examines why information gaps occur in building design decisions aiming to reduce Construction Waste (CW) and proposes key strategies to address them. By using advanced analysis techniques, such as ISM and MICMAC, the study offers practical insights for design teams to improve decision-making and minimize CW in building projects.

Featured Image

Read the Original

This page is a summary of: Optimizing design decisions for construction waste minimization through an interpretive structural modelling approach, Built Environment Project and Asset Management, March 2025, Emerald,
DOI: 10.1108/bepam-03-2024-0080.
You can read the full text:

Read

Contributors

Be the first to contribute to this page