EVM, ESM, and EDM(t) are simple and data-accessible methods. The power of the three methods is definitely larger than that of choosing only one for complex construction projects.

Featured Image

Why is it important?

For schedulers or researchers interested in implementing EVM, ESM and EDM(t), this study can provide more constructive instructions.

Perspectives

After completing an intensive literature review, this study conducts a case study to examine the forecasting performance of project duration using the EVM, ESM and EDM(t) methods.

Jyh-Bin Yang
National Central University

Read the Original

This page is a summary of: Selecting EVM, ESM and EDM(t) for managing construction project schedule, Engineering Construction & Architectural Management, June 2023, Emerald,