Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm

Michelle Blom, Adrian R. Pearce, Peter J. Stuckey
  • Engineering Optimization, February 2018, Taylor & Francis
  • DOI: 10.1080/0305215x.2018.1429601

The authors haven't finished explaining this publication. If you are the author, sign in to claim or explain your work.

Read Publication

http://dx.doi.org/10.1080/0305215x.2018.1429601

The following have contributed to this page: Dr Michelle L Blom and Peter J Stuckey