Integrated design is important to optimalize energy efficiency. Sumber Jeruk Springs have potential to gain electricity power and urban water supply. The design is planted to use water resources as power generating of hydro turbin and then pumped to a reservoir .
Featured Image
Why is it important?
However this design is new for the local government, so it need to be analyzed for its economic feasibility. The parameters are NPV, payback period, and Benefit Cost Ratio (BCR). From the result, it was shown that integrated system for optimize used about water resources was more benefit than if it is used only for generating power. So hopefully, this study can gain more government and public attention to do integrated design.
Perspectives
Writing this article was a great pleasure. It is not only about collaboration with other author but it is also a honor to analyze the problems and give public other point of view to develope our water resources.
khoirin nissa
Universitas Brawijaya
Read the Original
This page is a summary of: Economic feasibility of micro hydro power plant integrated with raw water supply design, January 2025, American Institute of Physics,
DOI: 10.1063/5.0264067.
You can read the full text:
Contributors
The following have contributed to this page