Publication not explained

This publication has not yet been explained in plain language by the author(s). However, you can still read the publication.

If you are one of the authors, claim this publication so you can create a plain language summary to help more people find, understand and use it.

Featured Image

Read the Original

This page is a summary of: Enabling Resilient Wide-area POD at BESS in Java, Indonesia 500 kV Power Grid, IET Generation Transmission & Distribution, June 2019, the Institution of Engineering and Technology (the IET),
DOI: 10.1049/iet-gtd.2018.6670.
You can read the full text:

Read

Contributors

The following have contributed to this page