What is it about?

The paper is about rembursement of generators in ISO markets.

Featured Image

Why is it important?

It is important because it proposes a technique to reduce the overall make-whole payments and system operation costs.

Perspectives

Author

Hrvoje Pandzic
University of Zagreb Faculty of Electrical Engineering and Computing

Read the Original

This page is a summary of: Energy and Reserve Co-optimization – Reserve Availability, Lost Opportunity and Uplift Compensation Cost, IET Generation Transmission & Distribution, October 2018, the Institution of Engineering and Technology (the IET),
DOI: 10.1049/iet-gtd.2018.5480.
You can read the full text:

Read

Contributors

The following have contributed to this page