The paper is about rembursement of generators in ISO markets.
Featured Image
Why is it important?
It is important because it proposes a technique to reduce the overall make-whole payments and system operation costs.
Perspectives
Author
Hrvoje Pandzic
University of Zagreb Faculty of Electrical Engineering and Computing
Read the Original
This page is a summary of: Energy and Reserve Co-optimization – Reserve Availability, Lost Opportunity and Uplift Compensation Cost, IET Generation Transmission & Distribution, October 2018, the Institution of Engineering and Technology (the IET),
DOI: 10.1049/iet-gtd.2018.5480.