The power transmission (PT) system is at the very heart of the power industry and which is vital to the development of a country. Delays in PT projects have a significant adverse effect on the economic development of a country and although billions of dollars are invested globally in PT projects, costly delays are common. Despite the critical nature of PT, the literature relating to the causes of delays is embryonic, with no theoretical or empirical studies yet conducted to establish the factors involved. This study presents a first step in rectifying this situation. A total of 74 published articles are reviewed that are most closely related to PT projects in order to identify their likely causes of delay. As a result, 82 potential causes of delay are identified and classified into nine major groups. The causes are then ranked in terms of their frequency of occurrence in the literature. Finally, conclusions are drawn concerning the extent to which this review and analysis may form a theoretical framework that can be tested empirically, as well as providing crucial information with recommendation to PT project stakeholders to achieve their key targets including the realisation of the benefits involved.
Featured Image
Why is it important?
As an integral part of the power sector, power transmission plays a vital role inβ the sustainable development of a country.
Perspectives
Read the Original
This page is a summary of: Comprehensive review of delays in power transmission projects, IET Generation Transmission & Distribution, November 2016, the Institution of Engineering and Technology (the IET),
DOI: 10.1049/iet-gtd.2016.0376.
You can read the full text:
Contributors
The following have contributed to this page