Featured Image

Why is it important?

The state estimation with phasor measurement units (PMU) are powerful technique for system monitoring and control. The results of state estimation are more accurate, when using phasor measurement units in the complex power systems. The state estimation problem in electrical power system consists of many basic operations, the important of them is the achievement of the observability system. we must determined the places of PMU. In this paper, improved particle swarm optimization is chosen to solve the problem.

Read the Original

This page is a summary of: Optimal phasor measurement units placement for full observability of power system using improved particle swarm optimisation , IET Generation Transmission & Distribution, May 2017, the Institution of Engineering and Technology (the IET),
DOI: 10.1049/iet-gtd.2016.1636.
You can read the full text:

Read

Contributors

The following have contributed to this page