Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study

  • Sam Mosallaeipour, Mazyar Ghadiri Nejad, Seyed Mahdi Shavarani, Ramtin Nazerian
  • Production Engineering, December 2017, Springer Science + Business Media
  • DOI: 10.1007/s11740-017-0784-x

The authors haven't finished explaining this publication. If you are the author, sign in to claim or explain your work.

Read Publication

http://dx.doi.org/10.1007/s11740-017-0784-x

The following have contributed to this page: Asst. Prof. Dr. Mazyar Ghadiri Nejad