What is it about?

The maintenance and production activities share the same system, it is necessary to model both activities simultaneously, we developed the integrated maintenance and production model for a multi-product system, and considered the setup sequences, that is, the sequence-dependent setup costs and times.

Featured Image

Why is it important?

The integrated model can be used to schedule maintenance and production simultaneously, and to save economic cost for company.

Perspectives

Writing this article was a great pleasure, one of the co-authors, Wenbin Wang, is my Ph.D. advisor, I am so grateful to him.

Xuejuan Liu
University of Science and Technology Beijing

Read the Original

This page is a summary of: An integrated preventive maintenance and production planning model with sequence-dependent setup costs and times, Quality and Reliability Engineering International, August 2017, Wiley,
DOI: 10.1002/qre.2202.
You can read the full text:

Read

Contributors

The following have contributed to this page