All Stories

  1. Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
  2. Scheduling a network of open-pit mines
  3. Automatic Minimal-Height Table Layout
  4. Interval Analysis and Machine Arithmetic
  5. A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines
  6. Incremental Satisfiability and Implication for UTVPI Constraints