All Stories

  1. Development of an economic replacement time model for mining equipment: a case study
  2. Data clustering, Data imputing, Multi-objective GA, Fuzzy c-means, K-means clustering
  3. Time Series Forecasting Using a Two-Level Multi-Objective Genetic Algorithm: A Case Study of Maintenance Cost Data for Tunnel Fans
  4. Time Series Forecasting Using a Two-level Multi-Objective Genetic Algorithm: A Case Study of Maintenance Cost Data for Tunnel Fans
  5. Comparison between Simulation and Analytical Methods in Reliability Data Analysis: A Case Study on Face Drilling Rigs
  6. Model for economic replacement time of mining production rigs including redundant rig costs
  7. Economic lifetime of a drilling machine: a case study on mining industry
  8. Downtime analysis of drilling machines and suggestions for improvements
  9. The aim is to develop a economic replacement model to identify the economic lifetime a machine.
  10. Economic lifetime prediction of a mining drilling machine using an artificial neural network
  11. Replacement time of mining drilling rigs
  12. Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014