All Stories

  1. Cutter-disc consumption during earth-pressure-balance tunnelling in mixed strata
  2. Simple Method to Predict Ground Displacements Caused by Installing Horizontal Jet-Grouting Columns
  3. Analytical approach for time-dependent groundwater inflow into shield tunnel face in confined aquifer
  4. Timoshenko beam solution for the response of existing tunnels because of tunneling underneath
  5. Characteristics of groundwater seepage with cut-off wall in gravel aquifer. II: Numerical analysis 1
  6. Characteristics of groundwater seepage with cut-off wall in gravel aquifer. I: Field observations 1