All Stories

  1. Modelling of train-induced vibration in subway interactions
  2. Long-term production scheduling optimization and 3D material mixing analysis for block caving mines
  3. Optimizing block caving drawpoints over multiple geostatistical models
  4. Conditional draw control system in block-cave production scheduling using mathematical programming
  5. An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation
  6. A multi-step approach for block-cave production scheduling optimization
  7. Mixed-Integer Linear Programming formulation for block-cave sequence optimisation
  8. Mixed integer linear programming formulations for open pit production scheduling
  9. Hierarchical mine production scheduling using discrete-event simulation
  10. Modified Kuz—Ram fragmentation model and its use at the Sungun Copper Mine
  11. Development of a new classification system for assessing of rock mass drillability index (RDi)
  12. The effects of jet grouting on slope stability at Shahriar dam, Iran
  13. RDi – A new method for evaluating of rock mass drillability