All Stories

  1. An Approach for Achieving Consistency for Symmetric Trapezoidal Interval Type-2 Fuzzy Sets
  2. The prospect of decent work, decent industrial relations and decent social relations in China: towards a multi-level and multi-disciplinary approach
  3. Network Design towards Sustainability of Chinese Baijiu Industry from a Supply Chain Perspective
  4. Scholars, strategists or stakeholders? Competing rationalities and impact of performance evaluation for academic managers in Chinese universities
  5. Multi-stakeholder collaboration in community post-disaster reconstruction: case study from the Longmen Shan Fault area in China
  6. Incorporating pollutants interaction with the environment and parameter uncertainty in water quality evaluation: a case of Lake Chauhan, China
  7. Prevalence and risk factors of depression in the empty nest elderly from the Sichuan Longmenshan fault earthquake
  8. The relationship between post-traumatic stress disorder and quality of life in infertile Shidu parents from the 2008 Sichuan earthquake: the moderating role of social support
  9. Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects
  10. Rough Approximation Operators in Group Mapping and Their Applications to Coding Theory
  11. Sensory information fusion–based fault diagnostics for complex electronic systems
  12. An approach to hesitant fuzzy multi-stage multi-criterion decision making
  13. ISHM-oriented adaptive fault diagnostics for avionics based on a distributed intelligent agent system
  14. Integrated System Health Management-based Fuzzy On-board Condition Prediction for Manned Spacecraft Avionics
  15. Antithetic Method-Based Particle Swarm Optimization for a Queuing Network Problem with Fuzzy Data in Concrete Transportation Systems
  16. Low-carbon Reconstruction: A Meta-Synthesis Approach for the Sustainable Development of a Post-Disaster Community
  17. A cloud theory-based particle swarm optimization for multiple decision maker vehicle routing problems with fuzzy random time windows
  18. A novel multiple decision-maker model for resource-constrained project scheduling problems