  1. Increasing the value of jetty projects based on building information modelling 5D (BIM 5D)
  2. Life cycle cost analysis in system dynamic modeling on Indonesia’s green toll road
  3. Improvement of time performance on the structure work of high-level residential buildings based on BIM 4D and M-PERT
  4. Green retrofitting in hospital project based on value engineering
  5. Minimize the risk of time delay & cost overrun based on M-PERT & BIM 5D on structural work in stadium construction
  6. Works analysis of bored pile, pile cap, and secant pile based on system dynamic model in residential high-rise building projects
  7. Zero energy office based on BIM 6D
  8. Integration of system dynamic and line of balance (LoB) in toll road development
  9. Life cycle cost analysis in dynamic modeling on high rise green retrofit office building
  10. Performance Improvement of Box Girder Construction on Toll Road Projects based on M-PERT and VE